
1
Stationery
India
Name : Nice Mechanical Pencil 0.7mm|Light Weight with Rubberised Grip| with 02 Xtra Long Lead Tubes|Pack of 05 Pencils, Free Eraser
Net Quantity (N) : 1
Package Includes - Mechanical Pencil Blister Pack, 5 Pcs , 0.7 mm Lead , Includes 2 Pcs Xtra Long Lead Tubes Each Pack, Retractable Mechanism.
Light-weight mechanical pencil with a rubberised grip
Triangular barel for relaxed drawing
Built-in eraser under the push-button cap for rapid corrections
Country of Origin : India
More Information
Helpful (3)
Helpful (6)